Description
The contract includes all the works of hydraulic installations: Drainage of rainwater, wastewater and consumption; Fire fighting network RIA + network of sprinklers; Supply and installation of a WWTP and an on-site hydraulics separator; Supply and installation of central drinking water supply and central fire-fighting; Wastewater pumping group; Water treatment system composed of a system of filters and chlorine dosing.
Start Date:September 2014
End Date:April 2015
Client:Centro Cerro Angola